First Orbital Data Center Nodes Reach Space: The January 2026 Milestone

Axiom Space launches first orbital data center nodes to LEO on Jan 11, 2026. Space-based computing infrastructure enters operational phase.

First Orbital Data Center Nodes Reach Space: The January 2026 Milestone

First Orbital Data Center Nodes Reach Space: The January 2026 Milestone

Jan 20, 2026 Written By Blake Crosley

Two orbital data center nodes launched to low-Earth orbit on January 11, 2026, establishing the first operational foundation for space-based cloud computing.1 Axiom Space deployed the nodes as part of Kepler Communications' optical relay network, enabling 2.5 Gbps data links between spacecraft without routing through ground stations.2 The launch transforms space-based computing from theoretical concept to operational infrastructure, with the in-orbit data center market projected to reach $1.77 billion by 2029 and $39.09 billion by 2035 at a 67.4% compound annual growth rate.3

TL;DR

Axiom Space launched the first two orbital data center nodes on January 11, 2026, creating infrastructure for in-space cloud computing and AI processing. The nodes operate on Kepler Communications' optical relay network, offering Earth-independent processing capabilities for satellites, constellations, and spacecraft. Multiple competitors including Starcloud (backed by NVIDIA), Google's Project Suncatcher, SpaceX's Starlink V3, and the European ASCEND initiative are racing to establish orbital computing presence. Space-based data centers address power constraints facing terrestrial AI infrastructure by accessing near-continuous solar energy that delivers up to 8x more power per panel than ground installations, though radiation protection and cooling challenges remain significant.

The January 11 launch

Axiom Space's ODC Nodes 1 and 2 represent an acceleration of plans to deploy multiple free-flyer nodes in LEO to meet rapidly emerging demand from defense and commercial customers requiring real-time, cyber-secure data processing and AI capabilities.4

Technical specifications:

Capability Specification
Optical link speed 2.5 Gbps
Maximum throughput 10 Gbps (SDA-compatible)
Network Kepler Communications optical relay constellation
Primary applications AI/ML processing, data fusion, space cybersecurity
Autonomy Earth-independent operations, local decision-making

The nodes feature optical intersatellite links (OISLs) meeting Space Development Agency (SDA) Tranche 1 interoperability standards, enabling integration with government and commercial space systems.5 Rather than transmitting raw data to Earth, satellites can send data to nearby ODC nodes via optical link for processing, filtering, feature detection, compression, or AI inference. The nodes buffer data if ground connectivity drops, make autonomous decisions, and trigger alerts independently.6

Axiom Space's development path

Axiom Space built toward the January launch through phased capability demonstrations. In fall 2025, the company deployed Data Center Unit-1 (AxDCU-1) aboard the International Space Station, running test applications to validate initial ODC capabilities powered by Red Hat Device Edge.7

The ISS prototype demonstrated cloud computing, AI/ML inference, data fusion, and cybersecurity applications using Earth-independent cloud storage and edge processing infrastructure.8 Results validated the approach before committing to dedicated free-flyer deployment.

Partnership ecosystem:

Partner Role
Kepler Communications Optical relay network hosting, constellation infrastructure
Skyloom Global Corp Optical intersatellite link integration
Space Development Agency Interoperability standards

Axiom Space will purchase additional payloads on Kepler's constellation to increase ODC capacity as demand materializes.9 Kepler's first tranche of optical data relay satellites launched in Q4 2025, including nine satellites and a spare in sun-synchronous orbit.10

Why space-based computing now

Terrestrial data center power consumption reached 415 TWh in 2024, representing 1.5% of global electricity.11 The International Energy Agency projects consumption reaching 650-1,050 TWh by 2026 and doubling to 945 TWh by 2030.12 Data centers in the United States alone will add 240 TWh by 2030, a 130% increase from 2024 levels.13

Grid constraints compound the growth challenge. Interconnection queues now stretch 7-12 years in key markets like Northern Virginia, California, and Germany.14 Power infrastructure cannot expand at the pace AI compute demands.

Space addresses the power equation fundamentally:

Solar efficiency advantages:

Location Solar Availability Annual Output Multiplier
Earth surface (mid-latitude) 6-8 hours/day, weather-dependent 1x baseline
Dawn-dusk sun-synchronous orbit Near-continuous sunlight 5-8x baseline

Earth's atmosphere attenuates and scatters solar radiation even on clear days. A solar array in space generates over 5x the energy of an identical array on Earth.15 Google's Project Suncatcher analysis found panels in dawn-dusk sun-synchronous orbit can be up to 8x more productive than ground installations by maintaining near-continuous power without batteries.16

A typical AI data center on Earth consumes as much electricity annually as 100,000 households.17 Terrestrial data center electricity consumption could exceed 1,000 TWh by 2026, equivalent to over one-third of global nuclear power generation.18

The competitive landscape

Multiple well-funded initiatives are racing to establish orbital computing infrastructure.

Starcloud (NVIDIA-backed)

Starcloud launched Starcloud-1 in November 2025, carrying an NVIDIA H100 GPU 100x more powerful than any previously operated in space.19 The company became the first to train an LLM in space and first to run a version of Gemini in orbit.20

Starcloud roadmap:

Milestone Timeline Capabilities
Starcloud-1 November 2025 H100 GPU, proof of concept
Starcloud-2 October 2026 Multiple H100s, Blackwell integration, 100x power increase
Commercial constellation 2028+ GPU clusters, persistent storage, continuous access
Long-term vision 2030s 5 GW orbital data center, 4 km solar/cooling panels

Starcloud-2, scheduled for October 2026, will include several NVIDIA H100 chips and integrate Blackwell architecture.21 The satellite features proprietary thermal and power systems within a SmallSat form factor, offering in-space users real-time analysis of terabyte-scale data streams and terrestrial users secure global storage with sovereign cloud capabilities.22

The company projects that within a decade, most new data centers will launch to space rather than build on Earth.23

Google Project Suncatcher

Google's moonshot explores equipping solar-powered satellite constellations with Tensor Processing Units (TPUs) and free-space optical links for distributed machine learning.24

Technical approach:

The pre-print paper theorizes an 81-satellite cluster within 1 km radius, using inter-satellite optical links for distributed ML compute.25 Google tested Trillium (v6e Cloud TPU) in a 67 MeV proton beam, finding the High Bandwidth Memory subsystems began showing irregularities only after 2 krad(Si) cumulative dose, nearly 3x the expected shielded five-year mission dose.26

Planned milestones:

Phase Timeline Objective
Learning mission Early 2027 Two prototype satellites with Planet Labs
Validation 2027-2028 Test TPU operation in space, validate optical inter-satellite links
Economic viability Mid-2030s Launch costs below $200/kg enable parity with terrestrial DC costs

Google's analysis suggests falling launch costs could make space-based compute economically viable within the next decade.27 If trends continue, launch costs below $200/kg by mid-2030s would make orbital compute clusters comparable in cost to terrestrial data centers.28

Elon Musk confirmed SpaceX will build space-based data centers by scaling Starlink V3 satellites, which feature 1 Tbps capacity and high-speed laser links.29

Starlink V3 specifications:

Specification Value
Bandwidth capacity 1 Tbps per satellite
Improvement over V2 mini 10x
Launch vehicle Starship
Launch capacity ~60 V3 satellites per Starship
Projected launch date H1 2026

Responding to coverage of space data center assembly, Musk stated: "Simply scaling up Starlink V3 satellites, which have high speed laser links would work. SpaceX will be doing this."30

SpaceX is reportedly seeking a $1.5 trillion valuation in a new funding round to support orbital data center development, potentially linked to a project called "Heart of the Galaxy."31

European ASCEND Initiative

The European Commission funded ASCEND (Advanced Space Cloud for European Net zero emission and Data sovereignty) through Horizon Europe to study space-based data center feasibility.32

ASCEND objectives:

Goal Detail
Primary mission Demonstrate EU green ambition with zero Earth CO2 emissions
Capacity target 1 GW before 2050
Market context 23 GW data center capacity projected by 2030
Funding €300 million through 2027
Focus European energy independence and data sovereignty

A Thales Alenia Space-led consortium including Orange Business, HPE, CloudFerro, ArianeGroup, Airbus Defence & Space, and DLR completed feasibility studies confirming technical and economic viability, projecting return on investment of several billion euros by 2050.33

Modular space infrastructures would use robotic assembly technologies from EROSS IOD (European Robotic Orbital Support Services In Orbit Demonstrator), scheduled to fly in 2026.34 ASCEND plans a demonstration mission deploying a small-scale orbital data center module to validate European technologies, with an in-orbit demonstration mission targeted for 2028.35

OrbitsEdge

OrbitsEdge targets its first orbital demonstration in 2026, partnering with HPE for AI-enabled space experiments.36

SatFrame technology:

OrbitsEdge developed a proprietary hardware system called SatFrame that counters space operating environment stress, allowing off-the-shelf Earth equipment like HPE Edgeline systems to operate in space without extensive custom work.37 SatFrame compensates for radiation, power, communications, and other environmental stressors in LEO.

The company aims to establish micro-data centers enabling organizations to analyze space-generated data at point of creation, reducing bandwidth requirements and unlocking mission capabilities impossible with Earth-dependent processing.38

Technical challenges

Space-based computing faces engineering obstacles distinct from terrestrial infrastructure.

Radiation exposure

Computing hardware requires protection from high-energy radiation through shielding or error-correcting software.39 In 2022, Starlink lost 38 satellites to solar activity. All satellites incorporate anti-radiation electronic components because space contains high-energy rays and electronic storms causing bit-flips and program errors.40

Google's radiation testing provides promising data. The Trillium TPU showed resilience up to nearly 3x expected five-year mission doses before irregularities appeared.41 However, consumer-grade GPUs like NVIDIA H100s lack radiation hardening, requiring either shielding (adding mass) or acceptance of higher fault rates.

Thermal management

Space eliminates convective cooling but introduces unique thermal challenges.

Cooling comparison:

Environment Method Constraint
Earth Air/liquid convection, evaporative cooling Water usage (5M+ gallons/day for large DCs)
Space Radiative heat rejection to vacuum Large radiator mass required

Without convection, orbital platforms need large radiators to dump heat into vacuum, adding significant mass that must be launched on rockets.42 Phase-change materials and advanced radiative panels are being explored, but thermal management adds cost and complexity. Radiators tend to weigh more than solar panels, potentially adding tens of billions to deployment costs.43

Starcloud's long-term 5 GW vision addresses thermal constraints through solar and cooling panels approximately 4 km in width and length.44

Cost and logistics

Launch costs remain the dominant barrier. Actual AI server equipment weighs tens of thousands of metric tons and costs tens of billions even on Earth.45 The logistical, economic, and engineering challenges of assembling and maintaining orbital power systems are enormous.

Cost trajectory projections:

Timeframe Launch Cost ($/kg) Implication
Current ~$1,500-2,500 Prohibitive for large-scale compute
Mid-2030s target <$200 Potential parity with terrestrial DC costs
SpaceX Starship goal $10-100 Transformative economics

Projections indicate that by 2026, an orbital data center could operate at 30% lower cost per compute cycle than a conventional terrestrial counterpart if launch cost targets are achieved.46 Environmental analysis suggests carbon footprint from hardware launches could be offset within five years of operation, after which facilities run on renewable energy indefinitely.47

Use cases and applications

Orbital data centers serve distinct market segments with different requirements.

Defense and national security

ODC Nodes 1 and 2 accelerate deployment to meet demand from defense applications requiring real-time, cyber-secure and quantum-secure data processing, AI/ML inference, and autonomous decision-making.48 Earth-independent operation means critical capabilities persist even if ground connectivity is compromised.

Space operations

Satellites generate terabytes of raw data. Rather than downlinking everything, orbital processing enables filtering, feature detection, compression, and inference at point of collection.49 This reduces bandwidth requirements and delivers low-latency insights from Earth observation without massive ground transmission.

Sovereign cloud computing

Starcloud-2 offers terrestrial users secure global data storage and premium sovereign cloud computing fully independent of Earth.50 Organizations with data sovereignty requirements gain infrastructure operating outside terrestrial jurisdictions.

Environmental applications

ASCEND specifically targets EU Green Deal objectives for net-zero carbon by 2050.51 Space data centers disconnected from ground energy grids offer controlled cybersecurity access and potentially lower environmental footprint than terrestrial alternatives once launched.52

The infrastructure deployment perspective

Space-based computing creates new categories of infrastructure deployment complexity that parallel terrestrial AI data center challenges at planetary scale.

Terrestrial deployments already require coordinating power distribution, liquid cooling, high-density networking, and precision installation across facilities consuming 100+ MW. Introl's global deployment capabilities span these requirements across 257 locations worldwide.

Orbital infrastructure amplifies every coordination challenge. Power systems must survive radiation and thermal cycling. Cooling systems operate in vacuum rather than atmosphere. Networking relies on optical free-space links rather than fiber. Maintenance requires robotic intervention rather than human technicians.

The skills gap between current terrestrial expertise and orbital requirements represents both challenge and opportunity. Organizations building competency in extreme-environment infrastructure deployment position themselves for the market ResearchAndMarkets projects reaching $39 billion by 2035.

Market outlook

The orbital data center market remains nascent but is accelerating rapidly.

Market projections:

Year Market Size Growth Driver
2025 <$500M R&D and demonstration missions
2029 $1.77B Initial commercial operations
2035 $39.09B Scaled deployment (67.4% CAGR)

Industry leaders increasingly endorse the trajectory. Amazon founder Jeff Bezos predicted gigawatt-scale data centers in space within 10-20 years.53 Former Google CEO Eric Schmidt acquired Relativity Space specifically due to interest in space-based data centers.54

2026 milestone summary:

Initiative 2026 Event
Axiom Space ODC Nodes 1 & 2 operational (January 11)
Starcloud Starcloud-2 commercial satellite (October)
OrbitsEdge First orbital demonstration
ASCEND EROSS IOD robotic assembly mission
SpaceX Starlink V3 initial launches (H1)

Key takeaways

For infrastructure planners:

  • Orbital computing represents a nascent but rapidly growing market segment
  • Radiation hardening, thermal management, and launch logistics create distinct requirements from terrestrial deployments
  • Optical intersatellite links are emerging as standard interconnect technology

For operations teams:

  • Earth-independent operation changes availability and maintenance assumptions
  • Autonomous decision-making capabilities become necessary rather than optional
  • Monitoring and troubleshooting require fundamentally different approaches than terrestrial systems

For strategic decision-makers:

  • Space-based computing addresses power constraints that limit terrestrial AI infrastructure expansion
  • Market projections suggest 67% CAGR through 2035 as commercial operations scale
  • Multiple well-funded competitors are racing to establish position

The January 11, 2026 launch of Axiom Space's orbital data center nodes marks the transition from theoretical concept to operational infrastructure. As terrestrial data centers strain against power grid constraints and interconnection delays stretching to decades, space-based alternatives offer a path to unlimited solar energy and potentially lower environmental impact. The infrastructure deployment challenges are immense, but so is the market opportunity for organizations that master them.


References


  1. Axiom Space. "Axiom Space to Launch Orbital Data Center Nodes to Support National Security, Commercial, International Customers." January 2026. https://www.axiomspace.com/release/axiom-space-to-launch-orbital-data-center-nodes-to-support-national-security-commercial-international-customers 

  2. Axiom Space. "Axiom Space Partners with Kepler Space and Skyloom to Operationalize the World's 1st Orbital Data Center." 2023. https://www.axiomspace.com/release/orbital-data-center 

  3. ResearchAndMarkets. "In-Orbit Data Centers Market Report 2025." April 2025. https://www.globenewswire.com/news-release/2025/04/08/3057428/28124/en/In-Orbit-Data-Centers-Market-Report-2025-Key-Players-like-NVIDIA-IBM-HPE-and-NASA-are-Pioneering-Scalable-Radiation-hardened-Computing-in-LEO.html 

  4. Axiom Space. "Orbital Data Centers." https://www.axiomspace.com/orbital-data-center 

  5. Data Center Dynamics. "Axiom Space purchases Kepler on-orbit compute payloads ahead of late-2025 constellation rollout." 2025. https://www.datacenterdynamics.com/en/news/axiom-space-purchases-kepler-on-orbit-compute-payloads-ahead-of-late-2025-constellation-rollout/ 

  6. Cutter Consortium. "On-Orbit Data Centers: Mapping the Leaders in Space-Based AI Computing." 2025. https://www.cutter.com/article/orbit-data-centers-mapping-leaders-space-ai-computing 

  7. Axiom Space. "Orbital Data Centers." https://www.axiomspace.com/orbital-data-center 

  8. Axiom Space. "In-Space Data & Security." https://www.axiomspace.com/in-space-data-security 

  9. SpaceNews. "Axiom Space to launch orbital data centers on Kepler satellites." 2025. https://spacenews.com/axiom-space-to-launch-orbital-data-centers-on-kepler-satellites/ 

  10. SatNews. "Axiom Space Partners with Kepler Space + Skyloom for world's 1st orbital data center." December 2023. https://news.satnews.com/2023/12/21/axiom-space-partners-with-kepler-space-skyloom-for-worlds-1st-orbital-data-center/ 

  11. IEA. "Energy demand from AI – Energy and AI – Analysis." 2025. https://www.iea.org/reports/energy-and-ai/energy-demand-from-ai 

  12. IEA. "Global data center power demand to double by 2030 on AI surge." S&P Global. April 2025. https://www.spglobal.com/energy/en/news-research/latest-news/electric-power/041025-global-data-center-power-demand-to-double-by-2030-on-ai-surge-iea 

  13. Data Center Dynamics. "IEA: Data center energy consumption set to double by 2030 to 945TWh." 2025. https://www.datacenterdynamics.com/en/news/iea-data-center-energy-consumption-set-to-double-by-2030-to-945twh/ 

  14. Network World. "Google warns grid connection delays are now the biggest threat to data center expansion." 2025. https://www.networkworld.com/article/4117329/google-warns-transmission-delays-are-now-the-biggest-threat-to-data-center-expansion.html 

  15. Starcloud. "Why we should train AI in space." White Paper. https://starcloudinc.github.io/wp.pdf 

  16. Google Research. "Exploring a space-based, scalable AI infrastructure system design." 2025. https://research.google/blog/exploring-a-space-based-scalable-ai-infrastructure-system-design/ 

  17. RackSolutions. "From Earth to Orbit: Are Data Centers Headed to Space?" 2025. https://www.racksolutions.com/news/data-centers-news/are-data-centers-headed-to-space/ 

  18. IBM. "Are data centers in space the future of cloud storage?" https://www.ibm.com/think/news/data-centers-space 

  19. CNBC. "Nvidia-backed Starcloud trains first AI model in space, orbital data centers." December 10, 2025. https://www.cnbc.com/2025/12/10/nvidia-backed-starcloud-trains-first-ai-model-in-space-orbital-data-centers.html 

  20. Y Combinator. "Starcloud: Data centers in space." https://www.ycombinator.com/companies/starcloud 

  21. GeekWire. "Starcloud plans its next moves after training first AI model in space." 2025. https://www.geekwire.com/2025/starcloud-power-training-ai-space/ 

  22. Starcloud. "Starcloud-2 | In-Space GPU Cluster & Cloud Computing Satellite." https://www.starcloud.com/starcloud-2 

  23. NVIDIA Blog. "How Starcloud Is Bringing Data Centers to Outer Space." 2025. https://blogs.nvidia.com/blog/starcloud/ 

  24. Google Blog. "Project Suncatcher explores powering AI in space." 2025. https://blog.google/technology/research/google-project-suncatcher/ 

  25. Data Center Dynamics. "Project Suncatcher: Google to launch TPUs into orbit with Planet Labs, envisions 1km arrays of 81-satellite compute clusters." November 2025. https://www.datacenterdynamics.com/en/news/project-suncatcher-google-to-launch-tpus-into-orbit-with-planet-labs-envisions-1km-arrays-of-81-satellite-compute-clusters/ 

  26. Google. "Suncatcher Paper." https://services.google.com/fh/files/misc/suncatcher_paper.pdf 

  27. InfoQ. "Google Unveils Project Suncatcher, Envisioning AI Models Running in Space." November 2025. https://www.infoq.com/news/2025/11/google-suncatcher-space/ 

  28. NextBigFuture. "Google Project Suncatcher to Put TPUs for AI in Space in 2027." November 2025. https://www.nextbigfuture.com/2025/11/google-project-suncatcher-to-put-tpus-for-ai-in-space-in-2027.html 

  29. Data Center Dynamics. "Elon Musk says SpaceX 'will be doing' data centers in space." 2025. https://www.datacenterdynamics.com/en/news/elon-musk-says-spacex-will-be-doing-data-centers-in-space/ 

  30. WebProNews. "SpaceX Plans Orbital Data Centers with Starlink V3 by 2026." 2025. https://www.webpronews.com/spacex-plans-orbital-data-centers-with-starlink-v3-by-2026/ 

  31. WebProNews. "Elon Musk's SpaceX Eyes Orbital Data Centers for AI Revolution." 2025. https://www.webpronews.com/elon-musks-spacex-eyes-orbital-data-centers-for-ai-revolution/ 

  32. ASCEND Horizon EU. "Advanced Space Cloud for European Net zero emission and Data sovereignty." https://ascend-horizon.eu/ 

  33. Thales Alenia Space. "Thales Alenia Space reveals results of ASCEND feasibility study on space data centers." June 2024. https://www.thalesaleniaspace.com/en/press-releases/thales-alenia-space-reveals-results-ascend-feasibility-study-space-data-centers-0 

  34. AccessHub Space. "ASCEND Project paves the way for revolutionary space data infrastructure." 2025. https://www.accesshub.space/post/ascend-project-paves-the-way-for-revolutionary-space-data-infrastructure 

  35. AI News Hub. "Space-Based Data Centres: The Future of AI Computing in 2025." 2025. https://www.ainewshub.org/post/space-based-data-centres 

  36. OrbitsEdge. "In the News." https://orbitsedge.com/in-the-news 

  37. TechCrunch. "OrbitsEdge partners with HPE on orbital data center computing and analytics." December 2019. https://techcrunch.com/2019/12/03/orbitsedge-partners-with-hpe-on-orbital-datacenter-computing-and-analytics/ 

  38. HPE Community. "Watch how HPE OEM helps OrbitsEdge to deliver Datacenter-Grade Computing Power in Space." https://community.hpe.com/t5/OEM-Solutions/Watch-how-HPE-OEM-helps-OrbitsEdge-to-deliver-Datacenter-Grade/ba-p/7097532 

  39. Scientific American. "Space-Based Data Centers Could Power AI with Solar Energy—At a Cost." 2025. https://www.scientificamerican.com/article/data-centers-in-space/ 

  40. Interesting Engineering. "Space data centers could satiate 165% surge in AI power hunger." 2025. https://interestingengineering.com/space/space-data-centers-solve-ai-power-hunger 

  41. Google Research. "Exploring a space-based, scalable AI infrastructure system design." 2025. https://research.google/blog/exploring-a-space-based-scalable-ai-infrastructure-system-design/ 

  42. Tom's Hardware. "Jeff Bezos envisions space-based data centers in 10 to 20 years." October 2025. https://www.tomshardware.com/tech-industry/artificial-intelligence/jeff-bezos-envisions-space-based-data-centers-in-10-to-20-years-could-allow-for-natural-cooling-and-more-effective-solar-power 

  43. Singularity Hub. "Data Centers in Space: Will 2027 Really Be the Year AI Goes to Orbit?" December 2025. https://singularityhub.com/2025/12/19/data-centers-in-space-will-2027-really-be-the-year-ai-goes-to-orbit/ 

  44. Starcloud. "Data Centers in Space | The Future of AI." https://www.starcloud.com 

  45. RackSolutions. "From Earth to Orbit: Are Data Centers Headed to Space?" 2025. https://www.racksolutions.com/news/data-centers-news/are-data-centers-headed-to-space/ 

  46. Concept to Cloud. "SpaceX Plans Orbital Data Centers with Starlink V3 by 2026." 2025. https://concepttocloud.com/news/spacex-orbital-data-centers-starlink-v3 

  47. Singularity Hub. "Future Data Centers Could Orbit Earth, Powered by the Sun and Cooled by the Vacuum of Space." November 2025. https://singularityhub.com/2025/11/03/future-data-centers-could-orbit-earth-powered-by-the-sun-and-cooled-by-the-vacuum-of-space/ 

  48. Axiom Space. "Axiom Space to Launch Orbital Data Center Nodes." January 2026. https://www.axiomspace.com/release/axiom-space-to-launch-orbital-data-center-nodes-to-support-national-security-commercial-international-customers 

  49. Cutter Consortium. "On-Orbit Data Centers: Mapping the Leaders in Space-Based AI Computing." 2025. https://www.cutter.com/article/orbit-data-centers-mapping-leaders-space-ai-computing 

  50. Starcloud. "Starcloud-2 | In-Space GPU Cluster & Cloud Computing Satellite." https://www.starcloud.com/starcloud-2 

  51. EuropaWire. "Thales Alenia Space Advances ASCEND Study for Space-Based Data Centers in European Green Initiative." June 2024. https://news.europawire.eu/thales-alenia-space-advances-ascend-study-for-space-based-data-centers-in-european-green-initiative/eu-press-release/2024/06/28/10/02/39/137493/ 

  52. ASCEND Horizon EU. "Data Centres in Space." https://ascend-horizon.eu/data-centres-in-space/ 

  53. CNBC. "Future of the cloud? From spas to orbital space data centers." December 29, 2025. https://www.cnbc.com/2025/12/29/future-of-the-cloud-from-spas-to-orbital-space-data-centers.html 

  54. Data Center Dynamics. "Elon Musk says SpaceX 'will be doing' data centers in space." 2025. https://www.datacenterdynamics.com/en/news/elon-musk-says-spacex-will-be-doing-data-centers-in-space/ 

Request a Quote_

Tell us about your project and we'll respond within 72 hours.

> TRANSMISSION_COMPLETE

Request Received_

Thank you for your inquiry. Our team will review your request and respond within 72 hours.

QUEUED FOR PROCESSING