xAI Colossus Hits 2 GW: 555,000 GPUs, $18B, Largest AI Site
Musk's xAI purchases third Memphis building for 2 GW total capacity. 555,000 NVIDIA GPUs at $18B makes Colossus the world's largest AI training facility.
Facility design, power systems, cooling technologies, and operational best practices for AI-ready data centers.
AI workloads have fundamentally changed what data centers need to deliver. 100kW+ racks, direct-to-chip liquid cooling, and megawatt-scale power feeds are no longer edge cases—they're requirements for competitive AI infrastructure.
This hub covers the facilities side of AI deployment: from brownfield retrofits to purpose-built GPU factories, and everything in between.
The facility decisions you make today will constrain—or enable—your AI capabilities for the next decade. Our infrastructure coverage helps you design and operate data centers that can evolve with the demands of AI.
Musk's xAI purchases third Memphis building for 2 GW total capacity. 555,000 NVIDIA GPUs at $18B makes Colossus the world's largest AI training facility.
Federal regulators clear the way for AI facilities to bypass the grid and connect straight to nuclear and gas plants. Here's what changes.
Liquid cooling transitions from bleeding-edge to baseline as GPU power densities make air cooling insufficient.
Modern AI demands 40-250kW per rack while traditional cooling fails at 15kW. Learn engineering solutions for extreme density infrastructure deployment.
NVIDIA Vera Rubin pushes data centers to 600kW racks by 2027, delivering 7.5x performance gains while demanding complete infrastructure transformation.
OpenAI's Stargate, a $500B joint venture with SoftBank, Oracle, and MGX, is building the world's largest AI infrastructure network to power tomorrow's artificial intelligence revolution.
Introl ranks #14 on Inc. 5000 with 9,594% growth, becoming America's fastest-growing GPU infrastructure specialist powering the AI revolution.
India deploys 80,000+ GPUs with $100B investment pipeline by 2027, achieving 34.4% CAGR as Asia's fastest-growing AI infrastructure market.
GPU racks hit 50kW thermal limits. Liquid cooling delivers 21% energy savings, 40% cost reduction. Essential guide for AI infrastructure teams facing the wall.
Isambard-AI's record-breaking deployment of 5,448 NVIDIA GPUs reveals why modern AI infrastructure demands specialized expertise in liquid cooling, high-density power, and complex networking.
NVIDIA's power smoothing cuts grid demand 30%. Liquid cooling handles 1,600W GPUs. Smart companies see 350% ROI while others face 80% failure rates.
xAI's Grok 4 achieves unprecedented benchmark scores with its 200,000-GPU infrastructure, doubling competitors' performance on critical reasoning tests. The model's unique multi-agent approach and int...
Tell us about your project and we'll respond within 72 hours.
Thank you for your inquiry. Our team will review your request and respond within 72 hours.